First we prepped the floor by cleaning with detergent or an acid wash as needed. Next, we patched existing pits & cracks in the floor and caulked or coated expansion joints. Next a grounding component for ESD was added and then we applied Neogard 70714/70715 epoxy in various coats to provide a primer & finish top coat.